2016年12月23日星期五

Considerations for Installation of Large Water Pump

When the large-scale water pump can not be assembled in the factory as a whole, need to be assembled at the scene, on-site installation of pump procedures and precautions:

 
(1) in the production of steel on the basis of steel stent (calculated by the designer drawn into the construction plans), and with the foundation through the anchor bolts together for rough level.
 
(2) pump and motor in place. Check the stator slot whether there is no foreign body; test whether the rotor and the stator clearance even sweep chamber phenomenon; motor bearing is intact, if the motor is not damaged, ; Replacement of lubricating oil.
 
If the pump is in place before cleaning, disassembly is required. When the use of bearing form, the need to check the side bearing clearance, to avoid the phenomenon of too loose or axle.
 
Pump and motor shaft coupling with the key fixed, requiring the installation of flat, square or square measurements can be used. All ready to place white in place can be used, such as tripod down the chain tools or lifting equipment.
 
(3) in place to adjust the level and concentricity. In order to ensure the safe operation of large pumps, multi-dial gauge and feeler with each other to find concentric.
 
(4) to install in line with regulatory requirements can be tightened after the various parts of the fixed bolts, do a good job on the coupling cover, to be test run.

Characteristics of packing seal of several common centrifugal pumps

Characteristics of packing seal of several common centrifugal pumps

2016年12月22日星期四

How to maintain the deep-well pump in the rainy season


First, for the disabled centrifugal pump, put the pump and hose to the motor shaft, put a net pump and hose inside the water. Then, according to technical requirements, carefully check the pump impeller, bearings, cups and other parts, if any damage should be replaced. Bearings with gasoline wash, coated with butter, and then installed. Pump at the end of the valve, elbow and other cast iron parts, rust to rust, and then coated with butter, on dry place to save, to prepare for winter and spring.
 
Second, deep well pump. If the deep well pump does not need to be used every 7 to 10 days to start running for half an hour to prevent electric motors, starters and other electrical equipment, damp and rusty parts of the pump rotation. If the shutdown time is longer, it should put the pump from the well, for repair, derusting, oiling and for parts, assembled after storage.
 
Third, the motor. Motor long-term need not easily damp, it should be removed from the well down, back to the room, the motor housing dirt wipe clean. On the mechanical part of the intact condition, according to technical requirements for inspection, if the wear parts, to repair or for parts, to meet the technical requirements, and then storage. If the short-term disabled, in the motor and starter, take the oil felt or plastic sheeting, good rain, moisture and dust and so on.
 
Fourth, the diesel engine. Summer and autumn rainy season, placed in the river, the wells do not use the diesel engine, should be promptly carried indoors. According to technical requirements for a thorough examination, maintenance, for parts, oil, so that all parts of the state to maintain intact. Then padded storage, to prepare for winter and spring.

Boiler feed water pump cavitation

Boiler feed water pump cavitation

DG type boiler feed pump purchase common sense

DG type boiler feed pump purchase common sense